OPENING OF KUALA LUMPUR INTERNATIONAL AIRPORT 2 (KLIA2)

We are pleased to inform you that the Kuala Lumpur International Airport 2 (KLIA2) will fully replace the Kuala Lumpur Low Cost Terminal (KLLCCT) on May 9, 2014.

Its opening, not only dubbed as the right time in lieu of Visit Malaysia Year 2014, but also marks as a strategic move by the country to become one of the global aviation hub and to offer our famous “Selamat Datang” welcome to passengers worldwide.

The huge size of KLIA2, with the size of at least 257,000 square metres (sqm) is able to handle up to 45 million passengers annually. It is also equipped with 60 gates, 8 remote stands, 80 aero-bridges, a third runway as well as a new air traffic control tower dubbed as Tower West.

It also has a built-in retail space of 32,000 sqm, which accommodates 225 retail outlets. That will surely keep the passengers lingering around in the airport to enjoy the services available and to shop.

KLIA2 FLOOR PLAN

KLT2(1)

KLIA2 MAP 

KLT2(2)

 

KLIA EKSPRES SERVICES FOR KLIA2

The same high-speed train service will connect KLIA-KLIA2 and the city. The non-stop train service will take 33 minutes between the airport (KLIA & KLIA2) and KL Sentral in the city.

Convenient Inter-terminal Transfer

Inter-terminal (KLIA & KLIA2) journey will only take 3 minutes.

Note: Our transfer rates to/from KLIA2 will be the same as that of KLIA as the 2 terminals are inter-connected, and in the same location.

 

For Packages please write to us on adler-torus@Hotmail.com 

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: